Fruitville Wastewater Treatment Plant Expansion - Sarasota, FL

DMK Associates was originally retained by Aqua Utilities Florida (AUF) to prepare a Preliminary Design Report (PDR) for the Florida Department of Environmental Protection. The PDR was tailored to reflect an initial re-rating of the Fruitville Wastewater Treatment Plant (FWWTP) from its current capacity of 1.5 million gallons per day (MGD) to 1.8 MGD and then an expansion to 2.4 MGD. The PDR also had to address an extensive expansion of the Reuse Areas within the Schroeder Manatee Ranch. While the PDR was in the permitting process with FDEP, AUF decided to skip the FWWTP re-rating and authorized DMK to proceed directly with the preparation of construction plans and bidding documents for the FWWTP expansion to 2.4 MGD. DMK's design efforts included major modifications to the headworks, new splitter box, new influent screen, a fourth process train, new reject pond, two new digesters and a concrete superstructure containing denitrifying filters, chlorine contact chambers and an effluent wet well. Post design services include bidding, negotiations with low bidder, award recommendation, and construction engineering and inspection.

©2005-2008 DMK Associates Inc.