Background

The project involves engineering services for the analysis, design and permitting of the improvements of approximately 120 feet of a stormwater conveyance ditch. Project tasks include the analysis of the contributing watershed to determine if improving the ditch and upgrading of an existing pipe system will relieve flooding upstream of the conveyance ditch without impacting the downstream stormwater system, and improving the ditch by stabilizing the side slopes using erosion control methods and materials.



Tasks

Data Collection: As part of the contract scope, DMK Associates has completed data collection from City of Venice and Sarasota County. We obtained geographical information from the Sarasota County Stormwater Division and an electronic copy of the AdICPR stormwater model for the Hatchett Creek drainage area. As-built information for the East Gate Subdivision enclosed stormwater system was obtained from the City of Venice. Topographic survey was also collected for approximately 750 linear feet of Roberta Ditch and portions of the downstream conveyance system.

Delineation of Basin and Subbasins: DMK Associates used the above information along with field verification to determine basin and subbasin boundaries within the vicinity of Roberta Ditch and the East Gate subdivision. The Sarasota County Basin Map was discretized into smaller subbasins in order to determine flows and elevations within the project area.

AdICPR Modeling: DMK Associates revised the Sarasota County AdICPR model using the information for the discretized basins and modeled the project area for the 5, 10, 25 and 100 year 24 hour storm events. Revisions to the Sarasota County AdICPR model were based on topographic survey completed by DMK Associates, as-built information obtained from the City of Venice and site visits

©2005-2008 DMK Associates Inc.